The upper deck of the 108-year-old bridge will be closed Aug. 2-29.Photo – TriMet
The Tri-County Metropolitan Transportation District of Oregon (TriMet) next month will temporarily close the Steel Bridge over the Willamette River in Portland to perform major repairs to the MAX light-rail system.
The upper deck of the 108-year-old bridge will be closed Aug. 2-29 while improved lift joints and locks, new switches and signal equipment are installed.
Copyright
© © TradePress Media Group, Inc.