Nine railroads — all passenger — have been determined to be "most at risk" of failing to qualify for an extension of the Dec. 31 deadline to implement positive train control (PTC), Federal Railroad Administrator Ronald Batory told a congressional panel last week.
Railroads that had installed less than 90 percent of its PTC system hardware as of June 30 are most at risk of failing to qualify for an "alternative schedule" for PTC implementation, Batory told the House Subcommittee on Railroads, Pipelines and Hazardous Materials during a hearing held Sept. 13.
Copyright
© © TradePress Media Group, Inc.